Referenzen

Extract from reference list                   
Analysis on side                   
Issue Nov. 2018                   
                   
No.    Customer    Country    Date    Project    Workings
                   
1    ccStadtwerke    Germany    1999    Outstation control system    Analysis on the basis of a damage by fire
2    ccShip Barcelona    Spain    1999    Switchgear and controlgear    Analysis on the basis of a damage by fire
3    ccMarine    Germany    2000    Frequency inverter  mylitary ship    Analysis on the basis of a damage by fire
4    ccPowerstation Viernheim    Germany    2000    Transformer station    Analysis on the basis of a damage by fire
5    ccSteel mill Bremen    Germany    2000    Control technology    Analysis on the basis of a damage by fire
6    ccUni     Germany    2000    Telecommunication    Analysis on the basis of a damage by fire
7    ccPaper mill    Germany    2000    Video control system    Analysis on the basis of a damage by fire
8    ccPower station Niederkrüchten    Germany    2000    Transformer station    Analysis on the basis of a damage by fire
9    ccShip yard Bremerhafen    Germany    2001    Switchgear and controlgear     Analysis on the basis of a damage by water
10    cDisposal company    Germany    2001    Switchgear and controlgear    Analysis on the basis of a damage by fire
11   cShip    2001    Generator Ship     Analysis on the basis of a damage by fire
12    cElectronik factory Essen    Germany    2001    PCB`s    Analysis on the basis of a damage by water
13    cPower Station Refinery Minatitlan    Mexico    2001    Control technology    Analysis on the basis of a damage by fire
14    cRolling mill    Germany    2001    Drive system    Analysis on the basis of a damage by fire
15    cPower plant Niederath    Germany    2001    Switchgear and controlgear    Analysis on the basis of a damage by fire
16    cWaste incineration plant Hamburg    Germany    2001    Drive system    Analysis on the basis of a damage by acid
17    cRefinery Wesseling    Germany    2002    Switchgear and controlgear    Analysis on the basis of a damage by acid
18    cManufactor    Germany    2002    Telecommunication    Analysis on the basis of a damage by fire
19    cTransport entrepreneurs    Germany    2002    Drive system    Analysis on the basis of a damage by fire
20    cAirport Germany West    Germany    2002    Transformer station    Analysis on the basis of a damage by water
21    cChip manufacturer    Italien    2002    Switchgear and controlgear    Analysis on the basis of a damage by fire
22    cShip Germany    Germany    2002    Technical equipment    Analysis on the basis of a damage by fire
23    cChemical laboratory    Germany    2002    Lab equipment    Analysis on the basis of a damage by fire
24    cLime mine    Germany    2002    Switchgear and controlgear    Analysis on the basis of a damage by fire
25    cAirport Germany West    Germany    2002    Control technology    Analysis on the basis of a damage by fire
26    cOilfield Kirkuk     Irak    2002    Control technology    Analysis on the basis of a damage by sulfid
27    cChip manufacturer    Germany    2002    Burning oven    Analysis on the basis of a damage by fire
28    cIT System Ransbach    Germany    2002    Switchgear and controlgear    Analysis on the basis of a damage by fire
29  ccPaper mill Hainsberg     Germany    2002    Switchgear and controlgear    Analysis on the basis of a damage by water
30    cPaper mill Golzern    Germany    2002    Switchgear and controlgear    Analysis on the basis of a damage by water
31    cManufacturer Stolberg    Germany    2003    Switchgear and controlgear    Analysis on the basis of a damage by fire
32    cPower plant Petersburg    Germany    2003    Control technology    Analysis on the basis of a damage by acid
33    cHard coal mine    Germany    2003    Switchgear and controlgear    Analysis on the basis of a damage by water
34    cPower station    Ukraine    2003    Control technology    Analysis on the basis of a damage by water
35    cManufacturer    Mexico    2003    Production cabinets    Analysis on the basis of a damage by fire
36    cHard coal mine Dortmund    Germany    2003    Building technology    Analysis on the basis of a damage by fire
37    cShip Rostock    Germany    2003    Switchgear and controlgear    Analysis on the basis of a damage by fire
38    cAutomotive producer Wolfsburg    Germany    2004    Network - Technik    Analysis on the basis of a damage by fire
39    cPaper manufacturer Mannheim    Germany    2004    Control cabinet    Analysis on the basis of a damage by fire
40    cManufacturer Regensburg    Germany    2004    Engine    Analysis on the basis of a damage by water
41    cProvider Viernheim    Germany    2000    Switchgear and controlgear    Analysis on the basis of a damage by fire
42    cAutomotive producer Bremen    Germany    2000    Compensations system    Analysis on the basis of a damage by fire
43    cContainer cranes Hamburg    Germany    2001    Frequency inverter  and engine    Analysis on the basis of a damage by water
44    cSteel manufacturer Dortmund    Germany    2003/04    Drive system    Analysis on the basis of a damage by fire
45    cHard coal mine Dortmund    Germany    2003/04    IT system    Analysis on the basis of a damage by fire
46    cGuangzhou Shipyard    China    2003/04    Ship    Analysis on the basis of a damage by dust
47    cChemistry factory    Germany    2003/04    Simatic S5    Analysis on the basis of a damage by dust
48    cShip Petersburg    Niederlande    2003/04    Frequency inverter      Analysis on the basis of a damage by dust
49    cPaper manufacturer Mannheim    Germany    2003/04    Control cabinet    Analysis on the basis of a damage by fire
50    cSteel manufacturer Dortmund    Germany    2003/04    Renovation after fire damage    Analysis on the basis of a damage by fire
51    cSteel manufacturer Marcinelle     Belgien    2003/04    Frequency inverter      Analysis on the basis of a damage by dust
52    cShip Dubai    Dubai    2003/04    Frequency inverter      Analysis on the basis of a damage by fire
53    cPaper mill    Belgien    2004/05    Frequency inverter      Analysis on the basis of a damage by dust
54    cHard coal factory Herne    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by dust
55    cDalian Shipbuilding     China    2004/05    Frequency inverter      Analysis on the basis of a damage by dust
56    cSteel manufacturer Duisburg    Germany    2004/05    Drive system    Analysis on the basis of a damage by dust
57    cManufcturer Stolberg    Germany    2004/05    Switchgear and controlgear    Analysis on the basis of a damage by dust
58    cSteel manufacturer Krefeld    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by dust
59    cIT provider Duisburg    Germany    2004/05    Dust damage    Analysis on the basis of a damage by dust
60    cHotel Düsseldorf AuS    Germany    2004/05    Switchgear and controlgear    Analysis on the basis of a damage by dust
61    cAutomotive producer Wolfsburg    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by fire
62    cShip Kinderdijk    Niederlande    2004/05    Frequency inverter      Analysis on the basis of a damage by dust
63    cManufcturer Manchester    England    2004/05    PCB`c    Analysis on the basis of a damage by dust
64    cSteel manufacturer    Südkorea    2004/05    Control cabinet    Analysis on the basis of a damage by dust
65    cPower station Eberbach    Germany    2004/05    Simatic    Analysis on the basis of a damage by dust
66    cTire manufacturer Homburg    Germany    2004/05    Simatic    Analysis on the basis of a damage by dust
67    cPharmaceutical company Ingelheim    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by dust
68    cPower provider Stuttgart    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by dust
69    cChemical industry Lampertheim    Germany    2004/05    Simoreg    Analysis on the basis of a damage by fire
70    cPower station Kaliningrad     Russland    2004/05    Teleperm M    Analysis on the basis of a damage by dust
71    cChemical producer Düsseldorf     Germany    2004/05    Frequency inverter      Analysis on the basis of a damage by dust
72    cVessel Rotterdam    Dubai    2004/05    MV - Frequency inverter      Analysis on the basis of a damage by dust
73    cPaper mill Mayen     Germany    2004/05    Switchgear and controlgear    Analysis on the basis of a damage by fire
74    cBrown coal mine Hambach    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by fire
75    cSteel manufacturer Duisburg     Germany    2004/05    Control cabinet    Analysis on the basis of a damage by dust
76    cSewage plant Limburger Hof    Germany    2004/05    Damage by water    Analysis on the basis of a damage by water
77    cShip Palermo    Italien    2004/05    MV - Frequency inverter      Analysis on the basis of a damage by dust
78    cAutomotive producer Wörth     Germany    2004/05    Simatic s5    Analysis on the basis of a damage by dust
79    cPharmaceutical manufacturer Ludwigshafen    Germany    2004/05    Power supply    Analysis on the basis of a damage by dust
80    cPower station Frimmersdorf     Germany    2004/05    Control cabinet    Analysis on the basis of a damage by fire
81    cShip Iran    Germany    2004/05    MV - Frequency inverter      Analysis on the basis of a damage by dust
82    cShip Athen     Griechenland    2004/05    Damage by fire    Analysis on the basis of a damage by fire
83    cAutomotive producer Krefeld    Germany    2004/05    HiPath    Analysis on the basis of a damage by dust
84    cManufacturer Lohmar    Germany    2004/05    Control cabinet    Analysis on the basis of a damage by fire
85    cPaper mill Köln     Germany    2004/05    Switchgear and controlgear    Analysis on the basis of a damage by fire
86    cAluminum mill Neuss    Germany    2005/06    Simatic    Analysis on the basis of a damage by dust
87    cSteel manufacturer Duisburg     Germany    2005/06    Control cabinet    Analysis on the basis of a damage by water
88    cAirport     Kanada    2005/06    Frequency inverter and IT controler    Analysis on the basis of a damage by dust
89    cPaper mill Neuss    Germany    2005/06    Control cabinet    Analysis on the basis of a damage by dust
90    cPharmaceutical manufacturer Ingelheim     Germany    2005/06    Thyristor system    Analysis on the basis of a damage by dust
91    cChip yard Dalian     China    2005/06    Frequency inverter    Analysis on the basis of a damage by dust
92    cSteel manufacturer Duisburg    Germany    2005/06    PCB`c    Analysis on the basis of a damage by fire
93    cMarine ship Glasgow    Scotland    2005/06    MV - Frequency inverter      Analysis on the basis of a damage by dust
94    cPapermill Liverpool    England    2005/06    Control cabinet    Analysis on the basis of a damage by water
95    cShip Senator     Niederlande    2005/06    Control cabinet    Analysis on the basis of a damage by dust
96    cPaper mill Mayen    Germany    2005/06    Switchgear and controlgear    Analysis on the basis of a damage by fire
97    cJail Koblenz    Germany    2005/06    Control cabinet    Analysis on the basis of a damage by dust
98    cSteel manufacturer Mettmann    Germany    2005/06    Building and Switchgear     Analysis on the basis of a damage by fire
99    cIron & Steel     Saudi Arabien    2005/06    MV - Frequency inverter      Analysis on the basis of a damage by dust
100    Power plant Niederaussem     Germany    2005/06    PC`s    Analysis on the basis of a damage by dust
101    Hard coal provider Kamp-Lintfort     Germany    2006/07    Thyristor system    Analysis on the basis of a damage by dust
102    Paper mill Mayen    Germany    2006/07    Frequency inverter    Analysis on the basis of a damage by fire
103    Garbage incinerator Oberhausen     Germany    2006/07    PCB`s    Analysis on the basis of a damage by dust
104    Paper mill Zülpich     Germany    2006/07    Frequency inverter    Analysis on the basis of a damage by dust
105    Refinery USA    USA    2006/07    Frequency inverter    Analysis on side, after sulphide damage
106    Power station Marsberg    Germany    2006/07    Frequency inverter    Analysis on the basis of a damage by dust
107    Iron & Steel     Saudi Arabia    2006/07    MV - Frequency inverter    Analysis on the basis of a damage by dust
108    Power station Hagen    Germany    2006/07    HiPath    Analysis on the basis of a damage by dust
109    Power Niederaussem     Germany    2006/07    Server    Analysis on the basis of a damage by dust
110    Steel manufacturer    Saudi Arabia    2006/07    Power supply    Analysis on the basis of a damage by dust
111    Steel manufacturer Dillenburg    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by water
112    VW Wolfsburg    Germany    2006/07    PCB cabinets    Analysis on the basis of a damage by dust
113    Steel manufacturer Dillenburg    Germany    2006/07    Transformer station    Analysis on the basis of a damage by dust
114    A&D PI Khe    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by dust
115    Power station Zayzoun     Syria    2006/07    TELEPERM XP    Analysis on the basis of a damage by dust
116    Power station Nasserieh    Syria    2006/07    TELEPERM XP    Analysis on the basis of a damage by dust
117    Marine vessel    Scotland    2006/07    Frequency inverter    Analysis on the basis of a damage by dust
118    Dredger ship    Dubai    2006/07    MV - Frequency inverter    Analysis on the basis of a damage by dust
119    Chemical industry    Qatar    2006/07    MV - Frequency inverter    Analysis on the basis of a damage by fire
120    Chemical industry    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by fire
121    Paper mill    Germany    2006/07    Transformer station    Analysis on the basis of a damage by dust
122    Chemical industry Niederkassel    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by fire
123    Power station Hamborn    Germany    2006/07    Thyristor cabinet    Analysis on the basis of a damage by dust
124    Steel manufacturer Linz     Austria    2006/07    Control cabinet    Analysis on the basis of a damage by fire
125    Airport Mexiko     Mexico    2006/07    Frequency inverter    Analysis on side, after damage by metal
126    Dredger ship    Qatar    2006/07    MV - Frequency inverter    Analysis on the basis of a damage by fire
127    Automotive producer Wolfsburg    Germany    2006/07    SIMATIC    Analysis on the basis of a damage by dust
128    Paper mill Zülpich    Germany    2006/07    Frequency inverter    Analysis on the basis of a damage by dust
129    Ship Oslo    Norway    2006/07    PCB`s    Analysis on the basis of a damage by dust
130    Paper mill Zülpich     Germany    2006/07    Frequency inverter    Analysis on the basis of a damage by dust
131    Steel manufacturer Bremen    Germany    2006/07    Power supply    Analysis on the basis of a damage by dust
132    Power provider Düsseldorf    Germany    2006/07    HiPath    Analysis on the basis of a damage by dust
133    Shipyard    Germany    2006/07    Submarine    Analysis on side, after damage by sufate
134    Steel manufacturer Wetzlar    Germany    2006/07    Power supply    Analysis on the basis of a damage by dust
135    Airlines Frankfurt    Germany    2006/07    HiPath    Analysis on the basis of a damage by dust
136    Paper mill Papier    Germany    2006/07    PCB`s    Analysis on the basis of a damage by dust
137    Paper mill Wörth    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by fire
138    Paper mill Düsseldorf    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by dust
139    Glass manufacturer Ladenburg     Germany    2006/07    SINAMICS    Analysis on the basis of a damage by dust
140    Power station Kiel    Germany    2006/07    Control cabinet    Analysis on the basis of a damage by dust
141    Paper mill Hürth     Germany    2006/07    Control cabinet    Analysis on side, after damage by metall
142    Power suplier Hamborn    Germany    2007/08    exciter system    Analysis on the basis of a damage by dust
143    Paper mill Papier    Begium    2007/08    PCB`s    Analysis on the basis of a damage by dust
144    Paper manufcturer Mayen    Germany    2007/08    Drive System`s    Analysis on the basis of a damage by dust
145    Paper mill Hürth     Germany    2007/08    Drive System`s    Analysis / causal research
146    Rolling mill Bremen    Germany    2007/08    SINAMIC`s 150    Analysis on the basis of a damage by dust
147    Distributor center Härkingen     Switzerland    2007/08    mail distributor center    Analysis on the basis of a damage by fire
148    Paper mill Mainz    Germany    2007/08    Drive System`s    Analysis on the basis of a damage by fire
149    Power station Lausward     Germany    2007/08    Drive System`s    Analysis on the basis of a damage by dust
150    Beverages factory Mexico    Mexico    2007/08    Manufacturing system`s    Analysis on the basis of a damage by water
151    Rolling mill Duisburg     Germany    2007/08    Drive System`s    Analysis on the basis of a damage by dust
152    Power plant Kiel    Germany    2007/08    Control system    Analysis on the basis of a damage by dust
153    Dredger ship Dubai    Dubai    2007/08    Drive System`s    Analysis on the basis of a damage by dust
154    Paper mill     Germany    2007/08    Engine`s    Analysis on the basis of a damage by dust
155    Power station Brindisi Italien    Italy    2007/08    TELEPERM XP    Analysis on the basis of a damage by dust
156    Rolling mill Belgien    Belgium    2007/08    Drive System`s    Analysis on the basis of a damage by dust
157    Ship Dubai    Dubai    2007/08    MV Drive system`s    Analysis on the basis of a damage by dust
158    Drilling rig     Singapore    2007/08    Drilling platform    Analysis on the basis of a damage by dust
159    Power plant Hagen    Germany    2007/08    SIMATIC S5    Analysis on the basis of a damage by dust
160    Steel manufacturer Dortmund    Germany    2007/08    Thyristor system`s    Analysis on the basis of a damage by dust
161    Marine Singapore    Singapore    2007/08    SINAMIC`s 150    Analysis on the basis of a damage by dust
162    Power station Heilbronn    Germany    2007/08    TELEPERM ME    Analysis on the basis of a damage by dust
163    Gas producer Aegypten    Egypt    2007/08    Drive System`s    Analysis / causal research / Renovation
164    RWE Strip mining Inden Eschweiler     Germany    2008/09    Switchgear cabinet    Analysis on the basis of a damage by dust
165    Power station Hagen    Germany    2008/09    SIMATIC S5    Analysis on the basis of a damage by dust
166    Paper mill Mannheim    Germany    2008/09    Switchgear cabinet    Analysis on the basis of a damage by dust
167    Power station Mainz/Wiesbaden    Germany    2008/09    Switchgear cabinet    Analysis on the basis of a damage by dust
168    Power provider Frankenthal    Germany    2008/09    High Voltage system SF-6    Analysis on the basis of a damage by dust
169    Cement factory    Saudi Arabia    2008/09    SINAMICS 120    Analysis on the basis of a damage by dust
170    Chemical industry    Qatar    2008/09    ROBICON Drive System    Analysis on the basis of a damage by dust
171    Rolling mill Hamburg    Germany    2008/09    Damage by water    Analysis on the basis of a damage by water
172    Gas producer    Qatar    2008/09    Engine    Analysis / causal research
173    Film producer Las Vegas     USA    2008/09    People Mover System    Analysis / causal research
174    Paper mill Mayen    Germany    2008/09    Drive System`s    Checking
175    Geothermal Power station Landau    Germany    2009/10    Drive System`s    Analysis on the basis of a damage by dust
176    Ship Yards St. Petersburg    Russia    2009/10    Analysis on Side    Analysis / causal research
177    Steel mill Cremona Italien    Italy    2009/10    Analysis on Side    Analysis / causal research
178    Power plant Dubai    Dubai    2009/10    Analysis on side    Analysis / causal research
179    Power station Berlin    Germany    2009/10    Damage by fire    Analysis on the basis of a damage by fire
180    Hospital Freiburg    Germany    2009/10    Damage by water    Analysis on the basis of a damage by water
181    Cement manufacturer Schelklingen    Germany    2009/10    Analysis on Side    Analysis / causal research
182    Steel mill Italien    Italy    2009/10    Analysis on Side    Analysis / causal research
183    Manufacturer Türkei    Türkei    2009/10    Analysis on Side    Analysis / causal research
184    Power station Erbach    Germany    2009/10    Power supply    Analysis on the basis of a damage by dust
185    Paper mill China    China    2009/10    Analysis on Side    Analysis / causal research
186    Paper mill Praguay    Paraguay    2009/10    Analysis on Side    Analysis / causal research
187    Power station Wuppertal    Germany    2009/10    Drive system`s    Analysis on the basis of a damage by dust
188    Paper mill Neuss    Germany    2009/10    Analysis on Side    Analysis / causal research
189    Blast furnace Duisburg    Germany    2010/11    Frequency Connverter    Analysis on the basis of a damage by dust
190    Steel manufacturer Wetzlar    Germany    2010/11    Frequency Connverter    Analysis on the basis of a damage by dust
191    Isolation manufacturer Speyer    Germany    2010/11    Frequency Connverter    Analysis on the basis of a damage by dust
192    Provider Viernheim    Germany    2010/11    PC    Analysis on the basis of a damage by dust
193    Copper manufacturer Pforzheim    Germany    2010/11    Damage by fire    Analysis on the basis of a damage by fire
194    Pharma manufacturer Ludwigshafen    Germany    2010/11    PCB    Analysis on the basis of a damage by dust
195    Train Neustrelitz    Germany    2010/11    Train    Analysis on the basis of a damage by dust
196    Paper mill    Germany    2010/11    Switchgear cabinet    Analysis on the basis of a damage by dust
197    Power switch system Luxemburg    Luxemburg    2010/11    Switchgear cabinet    Analysis on the basis of a damage by fire
198    Power plant    Germany    2010/11    PCB    Analysis on the basis of a damage by dust
199    Hydroelectric power station Kriebstein    Germany    2010/11    Switchgear cabinet    Analysis on the basis of a damage by fire
200    Steel mimm Dinslaken    Germany    2010/11    Frequency Connverter    Analysis on the basis of a damage by fire
201    Power station Wuppertal    Germany    2010/11    Switchgear cabinet 110 kV    Analysis on the basis of a damage by fire
202    Power plant Moncalieri    Italy    2010/11    Control systems    Analysis on the basis of a damage by dust
203    Manufacturer Venezuela    Venezuela    2010/11    Switchgear cabinet    Analysis on the basis of a damage by dust
204    Rolling mill Duisburg    Germany    2010/11    Frequency Connverter    Analysis on the basis of a damage by dust
205    Paper mill    Paraguay    2010/11    Switchgear and  Connverter    Analysis on the basis of a damage by dust
206    Radiology Mainz    Germany    2010/11    Thomograph    Analysis on the basis of a damage by dust
207    Paper mill Hürth    Germany    2010/11    Frequency Connverter    Analysis on the basis of a damage by dust
208    Train interlocking Mehrhoog    Germany    2010/11    Control systems    Analysis on the basis of a damage by dust
209    Power plant Hürth    Germany    2011/12    Frequency Connverter    Analysis on the basis of a damage by dust
210    Paper mill Hürth    Germany    2011/12    Frequency Connverter    Analysis on the basis of a damage by dust
211    Paper mill    Belgium    2011/12    PCB`s    Analysis on the basis of a damage by fire
212    Steel mill Duiburg    Germany    2011/12    Frequency Connverter    Analysis on the basis of a damage by dust
213    Sugar factory    Germany    2011/12    Switchgear cabinet    Analysis on the basis of a damage by fire
214    Steel mill Duisburg    Germany    2012/13    Frequency Connverter    Analysis on the basis of a damage by dust
215    Provider Hamm    Germany    2012/13    PCB`s    Analysis on the basis of a damage by dust
216    Steel manufacturer Troisdorf    Germany    2012/13    Switchgear    Analysis on the basis of a damage by fire
217    Drilling rig Wismar    Germany    2012/13    Analysis on side    Analysis on the basis of a damage by dust
218    Iron plant Sulzbach-Rosenberg    Germany    2012/13    Switchgear cabinet    Analysis on the basis of a damage by fire
219    Pump manufacturer Frankenthal    Germany    2012/13    Switchgear cabinet    Analysis on the basis of a damage by fire
220    Power station Zürich    Swiss    2013/14    Switchgear cabinet    Analysis on the basis of a damage by dust
221    Steel mill Brasilien    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
222    Steel mill Bremen    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by fire
223    Power station Wächtersbach    Germany    2013/14    Switchgear cabinet    Analysis on the basis of a damage by fire
224    Copper mine Sambia    Zambia    2013/14    Analysis on side    Analysis on the basis of a damage by dust
225    Pharma manufacturer Düsseldorf    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
226    Offshore Power station Rostock    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
227    Power plant Karlsruhe    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
228    Hard coal mine Lebach    Germany    2013/14    Switchgear     Analysis on the basis of a damage by fire
229    Rolling mill Duisburg    Germany    2013/14    Frequency Connverter    Analysis on the basis of a damage by dust
230    Onshore Power station Büttel    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
231    Paper mill Papier    Belgium    2013/14    PCB`s    Analysis on the basis of a damage by dust
232    Paper mill Grimma    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
233    Rolling mill Bremen    Germany    2013/14    Frequency Connverter    Analysis on the basis of a damage by dust
234    Cupper mine Chile    Chile    2013/14    Analysis on side    Analysis on the basis of a damage by dust
235    Ship yard Audorf    Germany    2013/14    Analysis on side    Analysis on the basis of a damage by dust
236    Manufacturer China    China    2013/14    Analysis on side    Analysis on the basis of a damage by dust
237    Technology provider Waltershausen    Germany    2013/14    Frequency Connverter    Analysis on the basis of a damage by dust
238    Disposak company    Germany    2014/15    Frequency Connverter    Analysis on the basis of a damage by dust
239    Paper mill    Kasachstan    2014/15    Frequency Connverter    Analysis on the basis of a damage by dust
240    Powerstation    Netherlands    2014/15    Control Systems    Analysis on the basis of a damage by dust
241    Rolling mill    Germany    2014/15    Engines    Analysis on the basis of a damage by dust
242    Rolling mill North    Germany    2014/15    Frequency Connverter    Analysis on the basis of a damage by dust
243    Powerstation    Germany    2014/15    Renovation after damage by fire    Analysis on the basis of a damage by fire
244    Automotiv producer    Germany    2014/15    Renovation after damage by fire    Analysis on the basis of a damage by fire
245    Salt mine    Germany    2014/15    Frequency Connverter    Analysis on the basis of a damage by dust
246    Shipping company    Germany    2014/15    Frequency Connverter    Analysis on the basis of a damage by dust
247    Powerstation    Germany    2014/15    Analysis on side    Analysis on the basis of a damage by dust
248    Winds park North Sea    Germany    2014/15    Analysis after damage by fire    Analysis on the basis of a damage by fire
249    Power Station     Dubai    2014/15    Instrumentation and control systems    Analysis on the basis of a damage by dust
250    Sugar factory    Germany    2015/16    Analysis after damage by fire    Analysis on the basis of a damage by fire
251    Cement plant    cement plant    2015/16    Frequency Connverter    Analysis on the basis of a damage by dust
252    Power Station     Italy    2015/16    Control sytems    Analysis on the basis of a damage by dust
253    Power Station Hamm     Germany    2015/16    Frequency Connverter    Analysis on the basis of a damage by dust
254    Automotiv producer    Germany    2015/16    Renovation after damage by fire    Analysis on the basis of a damage by fire
255    Cement plant    Tunesien    2015/16    Frequency Connverter    Analysis on the basis of a damage by dust
256    Shipping company    Germany    2015/16    Frequency Connverter    Analysis on the basis of a damage by dust
257    Crane manufacturer    China    2015/16    Frequency Connverter    Analysis on the basis of a damage by dust
258    TV Provider Mainz    Germany    2015/16    Damage by Fire    Analysis on the basis of a damage by fire
259    Power Station    Egypt    2016/17    Frequency Connverter    Analysis on the basis of a damage by dust
260    People Mover    Rusia    2016/17    Frequency Connverter    Analysis on the basis of a damage by dust
261    Refinery     Poland    2016/17    Control cabinets    Analysis on the basis of a damage by dust
262    Pump Manufacturer    Germany    2016/17    20 KV Switch Gear    Analysis on the basis of a damage by dust
263    Oil field    Germany    2017/18    Frequency Connverter    Analysis on the basis of a damage by dust


Share by: