Extract from reference list
Analysis on side
Issue Nov. 2018
No. Customer Country Date Project Workings
1 ccStadtwerke Germany 1999 Outstation control system Analysis on the basis of a damage by fire
2 ccShip Barcelona Spain 1999 Switchgear and controlgear Analysis on the basis of a damage by fire
3 ccMarine Germany 2000 Frequency inverter mylitary ship Analysis on the basis of a damage by fire
4 ccPowerstation Viernheim Germany 2000 Transformer station Analysis on the basis of a damage by fire
5 ccSteel mill Bremen Germany 2000 Control technology Analysis on the basis of a damage by fire
6 ccUni Germany 2000 Telecommunication Analysis on the basis of a damage by fire
7 ccPaper mill Germany 2000 Video control system Analysis on the basis of a damage by fire
8 ccPower station Niederkrüchten Germany 2000 Transformer station Analysis on the basis of a damage by fire
9 ccShip yard Bremerhafen Germany 2001 Switchgear and controlgear Analysis on the basis of a damage by water
10 cDisposal company Germany 2001 Switchgear and controlgear Analysis on the basis of a damage by fire
11 cShip 2001 Generator Ship Analysis on the basis of a damage by fire
12 cElectronik factory Essen Germany 2001 PCB`s Analysis on the basis of a damage by water
13 cPower Station Refinery Minatitlan Mexico 2001 Control technology Analysis on the basis of a damage by fire
14 cRolling mill Germany 2001 Drive system Analysis on the basis of a damage by fire
15 cPower plant Niederath Germany 2001 Switchgear and controlgear Analysis on the basis of a damage by fire
16 cWaste incineration plant Hamburg Germany 2001 Drive system Analysis on the basis of a damage by acid
17 cRefinery Wesseling Germany 2002 Switchgear and controlgear Analysis on the basis of a damage by acid
18 cManufactor Germany 2002 Telecommunication Analysis on the basis of a damage by fire
19 cTransport entrepreneurs Germany 2002 Drive system Analysis on the basis of a damage by fire
20 cAirport Germany West Germany 2002 Transformer station Analysis on the basis of a damage by water
21 cChip manufacturer Italien 2002 Switchgear and controlgear Analysis on the basis of a damage by fire
22 cShip Germany Germany 2002 Technical equipment Analysis on the basis of a damage by fire
23 cChemical laboratory Germany 2002 Lab equipment Analysis on the basis of a damage by fire
24 cLime mine Germany 2002 Switchgear and controlgear Analysis on the basis of a damage by fire
25 cAirport Germany West Germany 2002 Control technology Analysis on the basis of a damage by fire
26 cOilfield Kirkuk Irak 2002 Control technology Analysis on the basis of a damage by sulfid
27 cChip manufacturer Germany 2002 Burning oven Analysis on the basis of a damage by fire
28 cIT System Ransbach Germany 2002 Switchgear and controlgear Analysis on the basis of a damage by fire
29 ccPaper mill Hainsberg Germany 2002 Switchgear and controlgear Analysis on the basis of a damage by water
30 cPaper mill Golzern Germany 2002 Switchgear and controlgear Analysis on the basis of a damage by water
31 cManufacturer Stolberg Germany 2003 Switchgear and controlgear Analysis on the basis of a damage by fire
32 cPower plant Petersburg Germany 2003 Control technology Analysis on the basis of a damage by acid
33 cHard coal mine Germany 2003 Switchgear and controlgear Analysis on the basis of a damage by water
34 cPower station Ukraine 2003 Control technology Analysis on the basis of a damage by water
35 cManufacturer Mexico 2003 Production cabinets Analysis on the basis of a damage by fire
36 cHard coal mine Dortmund Germany 2003 Building technology Analysis on the basis of a damage by fire
37 cShip Rostock Germany 2003 Switchgear and controlgear Analysis on the basis of a damage by fire
38 cAutomotive producer Wolfsburg Germany 2004 Network - Technik Analysis on the basis of a damage by fire
39 cPaper manufacturer Mannheim Germany 2004 Control cabinet Analysis on the basis of a damage by fire
40 cManufacturer Regensburg Germany 2004 Engine Analysis on the basis of a damage by water
41 cProvider Viernheim Germany 2000 Switchgear and controlgear Analysis on the basis of a damage by fire
42 cAutomotive producer Bremen Germany 2000 Compensations system Analysis on the basis of a damage by fire
43 cContainer cranes Hamburg Germany 2001 Frequency inverter and engine Analysis on the basis of a damage by water
44 cSteel manufacturer Dortmund Germany 2003/04 Drive system Analysis on the basis of a damage by fire
45 cHard coal mine Dortmund Germany 2003/04 IT system Analysis on the basis of a damage by fire
46 cGuangzhou Shipyard China 2003/04 Ship Analysis on the basis of a damage by dust
47 cChemistry factory Germany 2003/04 Simatic S5 Analysis on the basis of a damage by dust
48 cShip Petersburg Niederlande 2003/04 Frequency inverter Analysis on the basis of a damage by dust
49 cPaper manufacturer Mannheim Germany 2003/04 Control cabinet Analysis on the basis of a damage by fire
50 cSteel manufacturer Dortmund Germany 2003/04 Renovation after fire damage Analysis on the basis of a damage by fire
51 cSteel manufacturer Marcinelle Belgien 2003/04 Frequency inverter Analysis on the basis of a damage by dust
52 cShip Dubai Dubai 2003/04 Frequency inverter Analysis on the basis of a damage by fire
53 cPaper mill Belgien 2004/05 Frequency inverter Analysis on the basis of a damage by dust
54 cHard coal factory Herne Germany 2004/05 Control cabinet Analysis on the basis of a damage by dust
55 cDalian Shipbuilding China 2004/05 Frequency inverter Analysis on the basis of a damage by dust
56 cSteel manufacturer Duisburg Germany 2004/05 Drive system Analysis on the basis of a damage by dust
57 cManufcturer Stolberg Germany 2004/05 Switchgear and controlgear Analysis on the basis of a damage by dust
58 cSteel manufacturer Krefeld Germany 2004/05 Control cabinet Analysis on the basis of a damage by dust
59 cIT provider Duisburg Germany 2004/05 Dust damage Analysis on the basis of a damage by dust
60 cHotel Düsseldorf AuS Germany 2004/05 Switchgear and controlgear Analysis on the basis of a damage by dust
61 cAutomotive producer Wolfsburg Germany 2004/05 Control cabinet Analysis on the basis of a damage by fire
62 cShip Kinderdijk Niederlande 2004/05 Frequency inverter Analysis on the basis of a damage by dust
63 cManufcturer Manchester England 2004/05 PCB`c Analysis on the basis of a damage by dust
64 cSteel manufacturer Südkorea 2004/05 Control cabinet Analysis on the basis of a damage by dust
65 cPower station Eberbach Germany 2004/05 Simatic Analysis on the basis of a damage by dust
66 cTire manufacturer Homburg Germany 2004/05 Simatic Analysis on the basis of a damage by dust
67 cPharmaceutical company Ingelheim Germany 2004/05 Control cabinet Analysis on the basis of a damage by dust
68 cPower provider Stuttgart Germany 2004/05 Control cabinet Analysis on the basis of a damage by dust
69 cChemical industry Lampertheim Germany 2004/05 Simoreg Analysis on the basis of a damage by fire
70 cPower station Kaliningrad Russland 2004/05 Teleperm M Analysis on the basis of a damage by dust
71 cChemical producer Düsseldorf Germany 2004/05 Frequency inverter Analysis on the basis of a damage by dust
72 cVessel Rotterdam Dubai 2004/05 MV - Frequency inverter Analysis on the basis of a damage by dust
73 cPaper mill Mayen Germany 2004/05 Switchgear and controlgear Analysis on the basis of a damage by fire
74 cBrown coal mine Hambach Germany 2004/05 Control cabinet Analysis on the basis of a damage by fire
75 cSteel manufacturer Duisburg Germany 2004/05 Control cabinet Analysis on the basis of a damage by dust
76 cSewage plant Limburger Hof Germany 2004/05 Damage by water Analysis on the basis of a damage by water
77 cShip Palermo Italien 2004/05 MV - Frequency inverter Analysis on the basis of a damage by dust
78 cAutomotive producer Wörth Germany 2004/05 Simatic s5 Analysis on the basis of a damage by dust
79 cPharmaceutical manufacturer Ludwigshafen Germany 2004/05 Power supply Analysis on the basis of a damage by dust
80 cPower station Frimmersdorf Germany 2004/05 Control cabinet Analysis on the basis of a damage by fire
81 cShip Iran Germany 2004/05 MV - Frequency inverter Analysis on the basis of a damage by dust
82 cShip Athen Griechenland 2004/05 Damage by fire Analysis on the basis of a damage by fire
83 cAutomotive producer Krefeld Germany 2004/05 HiPath Analysis on the basis of a damage by dust
84 cManufacturer Lohmar Germany 2004/05 Control cabinet Analysis on the basis of a damage by fire
85 cPaper mill Köln Germany 2004/05 Switchgear and controlgear Analysis on the basis of a damage by fire
86 cAluminum mill Neuss Germany 2005/06 Simatic Analysis on the basis of a damage by dust
87 cSteel manufacturer Duisburg Germany 2005/06 Control cabinet Analysis on the basis of a damage by water
88 cAirport Kanada 2005/06 Frequency inverter and IT controler Analysis on the basis of a damage by dust
89 cPaper mill Neuss Germany 2005/06 Control cabinet Analysis on the basis of a damage by dust
90 cPharmaceutical manufacturer Ingelheim Germany 2005/06 Thyristor system Analysis on the basis of a damage by dust
91 cChip yard Dalian China 2005/06 Frequency inverter Analysis on the basis of a damage by dust
92 cSteel manufacturer Duisburg Germany 2005/06 PCB`c Analysis on the basis of a damage by fire
93 cMarine ship Glasgow Scotland 2005/06 MV - Frequency inverter Analysis on the basis of a damage by dust
94 cPapermill Liverpool England 2005/06 Control cabinet Analysis on the basis of a damage by water
95 cShip Senator Niederlande 2005/06 Control cabinet Analysis on the basis of a damage by dust
96 cPaper mill Mayen Germany 2005/06 Switchgear and controlgear Analysis on the basis of a damage by fire
97 cJail Koblenz Germany 2005/06 Control cabinet Analysis on the basis of a damage by dust
98 cSteel manufacturer Mettmann Germany 2005/06 Building and Switchgear Analysis on the basis of a damage by fire
99 cIron & Steel Saudi Arabien 2005/06 MV - Frequency inverter Analysis on the basis of a damage by dust
100 Power plant Niederaussem Germany 2005/06 PC`s Analysis on the basis of a damage by dust
101 Hard coal provider Kamp-Lintfort Germany 2006/07 Thyristor system Analysis on the basis of a damage by dust
102 Paper mill Mayen Germany 2006/07 Frequency inverter Analysis on the basis of a damage by fire
103 Garbage incinerator Oberhausen Germany 2006/07 PCB`s Analysis on the basis of a damage by dust
104 Paper mill Zülpich Germany 2006/07 Frequency inverter Analysis on the basis of a damage by dust
105 Refinery USA USA 2006/07 Frequency inverter Analysis on side, after sulphide damage
106 Power station Marsberg Germany 2006/07 Frequency inverter Analysis on the basis of a damage by dust
107 Iron & Steel Saudi Arabia 2006/07 MV - Frequency inverter Analysis on the basis of a damage by dust
108 Power station Hagen Germany 2006/07 HiPath Analysis on the basis of a damage by dust
109 Power Niederaussem Germany 2006/07 Server Analysis on the basis of a damage by dust
110 Steel manufacturer Saudi Arabia 2006/07 Power supply Analysis on the basis of a damage by dust
111 Steel manufacturer Dillenburg Germany 2006/07 Control cabinet Analysis on the basis of a damage by water
112 VW Wolfsburg Germany 2006/07 PCB cabinets Analysis on the basis of a damage by dust
113 Steel manufacturer Dillenburg Germany 2006/07 Transformer station Analysis on the basis of a damage by dust
114 A&D PI Khe Germany 2006/07 Control cabinet Analysis on the basis of a damage by dust
115 Power station Zayzoun Syria 2006/07 TELEPERM XP Analysis on the basis of a damage by dust
116 Power station Nasserieh Syria 2006/07 TELEPERM XP Analysis on the basis of a damage by dust
117 Marine vessel Scotland 2006/07 Frequency inverter Analysis on the basis of a damage by dust
118 Dredger ship Dubai 2006/07 MV - Frequency inverter Analysis on the basis of a damage by dust
119 Chemical industry Qatar 2006/07 MV - Frequency inverter Analysis on the basis of a damage by fire
120 Chemical industry Germany 2006/07 Control cabinet Analysis on the basis of a damage by fire
121 Paper mill Germany 2006/07 Transformer station Analysis on the basis of a damage by dust
122 Chemical industry Niederkassel Germany 2006/07 Control cabinet Analysis on the basis of a damage by fire
123 Power station Hamborn Germany 2006/07 Thyristor cabinet Analysis on the basis of a damage by dust
124 Steel manufacturer Linz Austria 2006/07 Control cabinet Analysis on the basis of a damage by fire
125 Airport Mexiko Mexico 2006/07 Frequency inverter Analysis on side, after damage by metal
126 Dredger ship Qatar 2006/07 MV - Frequency inverter Analysis on the basis of a damage by fire
127 Automotive producer Wolfsburg Germany 2006/07 SIMATIC Analysis on the basis of a damage by dust
128 Paper mill Zülpich Germany 2006/07 Frequency inverter Analysis on the basis of a damage by dust
129 Ship Oslo Norway 2006/07 PCB`s Analysis on the basis of a damage by dust
130 Paper mill Zülpich Germany 2006/07 Frequency inverter Analysis on the basis of a damage by dust
131 Steel manufacturer Bremen Germany 2006/07 Power supply Analysis on the basis of a damage by dust
132 Power provider Düsseldorf Germany 2006/07 HiPath Analysis on the basis of a damage by dust
133 Shipyard Germany 2006/07 Submarine Analysis on side, after damage by sufate
134 Steel manufacturer Wetzlar Germany 2006/07 Power supply Analysis on the basis of a damage by dust
135 Airlines Frankfurt Germany 2006/07 HiPath Analysis on the basis of a damage by dust
136 Paper mill Papier Germany 2006/07 PCB`s Analysis on the basis of a damage by dust
137 Paper mill Wörth Germany 2006/07 Control cabinet Analysis on the basis of a damage by fire
138 Paper mill Düsseldorf Germany 2006/07 Control cabinet Analysis on the basis of a damage by dust
139 Glass manufacturer Ladenburg Germany 2006/07 SINAMICS Analysis on the basis of a damage by dust
140 Power station Kiel Germany 2006/07 Control cabinet Analysis on the basis of a damage by dust
141 Paper mill Hürth Germany 2006/07 Control cabinet Analysis on side, after damage by metall
142 Power suplier Hamborn Germany 2007/08 exciter system Analysis on the basis of a damage by dust
143 Paper mill Papier Begium 2007/08 PCB`s Analysis on the basis of a damage by dust
144 Paper manufcturer Mayen Germany 2007/08 Drive System`s Analysis on the basis of a damage by dust
145 Paper mill Hürth Germany 2007/08 Drive System`s Analysis / causal research
146 Rolling mill Bremen Germany 2007/08 SINAMIC`s 150 Analysis on the basis of a damage by dust
147 Distributor center Härkingen Switzerland 2007/08 mail distributor center Analysis on the basis of a damage by fire
148 Paper mill Mainz Germany 2007/08 Drive System`s Analysis on the basis of a damage by fire
149 Power station Lausward Germany 2007/08 Drive System`s Analysis on the basis of a damage by dust
150 Beverages factory Mexico Mexico 2007/08 Manufacturing system`s Analysis on the basis of a damage by water
151 Rolling mill Duisburg Germany 2007/08 Drive System`s Analysis on the basis of a damage by dust
152 Power plant Kiel Germany 2007/08 Control system Analysis on the basis of a damage by dust
153 Dredger ship Dubai Dubai 2007/08 Drive System`s Analysis on the basis of a damage by dust
154 Paper mill Germany 2007/08 Engine`s Analysis on the basis of a damage by dust
155 Power station Brindisi Italien Italy 2007/08 TELEPERM XP Analysis on the basis of a damage by dust
156 Rolling mill Belgien Belgium 2007/08 Drive System`s Analysis on the basis of a damage by dust
157 Ship Dubai Dubai 2007/08 MV Drive system`s Analysis on the basis of a damage by dust
158 Drilling rig Singapore 2007/08 Drilling platform Analysis on the basis of a damage by dust
159 Power plant Hagen Germany 2007/08 SIMATIC S5 Analysis on the basis of a damage by dust
160 Steel manufacturer Dortmund Germany 2007/08 Thyristor system`s Analysis on the basis of a damage by dust
161 Marine Singapore Singapore 2007/08 SINAMIC`s 150 Analysis on the basis of a damage by dust
162 Power station Heilbronn Germany 2007/08 TELEPERM ME Analysis on the basis of a damage by dust
163 Gas producer Aegypten Egypt 2007/08 Drive System`s Analysis / causal research / Renovation
164 RWE Strip mining Inden Eschweiler Germany 2008/09 Switchgear cabinet Analysis on the basis of a damage by dust
165 Power station Hagen Germany 2008/09 SIMATIC S5 Analysis on the basis of a damage by dust
166 Paper mill Mannheim Germany 2008/09 Switchgear cabinet Analysis on the basis of a damage by dust
167 Power station Mainz/Wiesbaden Germany 2008/09 Switchgear cabinet Analysis on the basis of a damage by dust
168 Power provider Frankenthal Germany 2008/09 High Voltage system SF-6 Analysis on the basis of a damage by dust
169 Cement factory Saudi Arabia 2008/09 SINAMICS 120 Analysis on the basis of a damage by dust
170 Chemical industry Qatar 2008/09 ROBICON Drive System Analysis on the basis of a damage by dust
171 Rolling mill Hamburg Germany 2008/09 Damage by water Analysis on the basis of a damage by water
172 Gas producer Qatar 2008/09 Engine Analysis / causal research
173 Film producer Las Vegas USA 2008/09 People Mover System Analysis / causal research
174 Paper mill Mayen Germany 2008/09 Drive System`s Checking
175 Geothermal Power station Landau Germany 2009/10 Drive System`s Analysis on the basis of a damage by dust
176 Ship Yards St. Petersburg Russia 2009/10 Analysis on Side Analysis / causal research
177 Steel mill Cremona Italien Italy 2009/10 Analysis on Side Analysis / causal research
178 Power plant Dubai Dubai 2009/10 Analysis on side Analysis / causal research
179 Power station Berlin Germany 2009/10 Damage by fire Analysis on the basis of a damage by fire
180 Hospital Freiburg Germany 2009/10 Damage by water Analysis on the basis of a damage by water
181 Cement manufacturer Schelklingen Germany 2009/10 Analysis on Side Analysis / causal research
182 Steel mill Italien Italy 2009/10 Analysis on Side Analysis / causal research
183 Manufacturer Türkei Türkei 2009/10 Analysis on Side Analysis / causal research
184 Power station Erbach Germany 2009/10 Power supply Analysis on the basis of a damage by dust
185 Paper mill China China 2009/10 Analysis on Side Analysis / causal research
186 Paper mill Praguay Paraguay 2009/10 Analysis on Side Analysis / causal research
187 Power station Wuppertal Germany 2009/10 Drive system`s Analysis on the basis of a damage by dust
188 Paper mill Neuss Germany 2009/10 Analysis on Side Analysis / causal research
189 Blast furnace Duisburg Germany 2010/11 Frequency Connverter Analysis on the basis of a damage by dust
190 Steel manufacturer Wetzlar Germany 2010/11 Frequency Connverter Analysis on the basis of a damage by dust
191 Isolation manufacturer Speyer Germany 2010/11 Frequency Connverter Analysis on the basis of a damage by dust
192 Provider Viernheim Germany 2010/11 PC Analysis on the basis of a damage by dust
193 Copper manufacturer Pforzheim Germany 2010/11 Damage by fire Analysis on the basis of a damage by fire
194 Pharma manufacturer Ludwigshafen Germany 2010/11 PCB Analysis on the basis of a damage by dust
195 Train Neustrelitz Germany 2010/11 Train Analysis on the basis of a damage by dust
196 Paper mill Germany 2010/11 Switchgear cabinet Analysis on the basis of a damage by dust
197 Power switch system Luxemburg Luxemburg 2010/11 Switchgear cabinet Analysis on the basis of a damage by fire
198 Power plant Germany 2010/11 PCB Analysis on the basis of a damage by dust
199 Hydroelectric power station Kriebstein Germany 2010/11 Switchgear cabinet Analysis on the basis of a damage by fire
200 Steel mimm Dinslaken Germany 2010/11 Frequency Connverter Analysis on the basis of a damage by fire
201 Power station Wuppertal Germany 2010/11 Switchgear cabinet 110 kV Analysis on the basis of a damage by fire
202 Power plant Moncalieri Italy 2010/11 Control systems Analysis on the basis of a damage by dust
203 Manufacturer Venezuela Venezuela 2010/11 Switchgear cabinet Analysis on the basis of a damage by dust
204 Rolling mill Duisburg Germany 2010/11 Frequency Connverter Analysis on the basis of a damage by dust
205 Paper mill Paraguay 2010/11 Switchgear and Connverter Analysis on the basis of a damage by dust
206 Radiology Mainz Germany 2010/11 Thomograph Analysis on the basis of a damage by dust
207 Paper mill Hürth Germany 2010/11 Frequency Connverter Analysis on the basis of a damage by dust
208 Train interlocking Mehrhoog Germany 2010/11 Control systems Analysis on the basis of a damage by dust
209 Power plant Hürth Germany 2011/12 Frequency Connverter Analysis on the basis of a damage by dust
210 Paper mill Hürth Germany 2011/12 Frequency Connverter Analysis on the basis of a damage by dust
211 Paper mill Belgium 2011/12 PCB`s Analysis on the basis of a damage by fire
212 Steel mill Duiburg Germany 2011/12 Frequency Connverter Analysis on the basis of a damage by dust
213 Sugar factory Germany 2011/12 Switchgear cabinet Analysis on the basis of a damage by fire
214 Steel mill Duisburg Germany 2012/13 Frequency Connverter Analysis on the basis of a damage by dust
215 Provider Hamm Germany 2012/13 PCB`s Analysis on the basis of a damage by dust
216 Steel manufacturer Troisdorf Germany 2012/13 Switchgear Analysis on the basis of a damage by fire
217 Drilling rig Wismar Germany 2012/13 Analysis on side Analysis on the basis of a damage by dust
218 Iron plant Sulzbach-Rosenberg Germany 2012/13 Switchgear cabinet Analysis on the basis of a damage by fire
219 Pump manufacturer Frankenthal Germany 2012/13 Switchgear cabinet Analysis on the basis of a damage by fire
220 Power station Zürich Swiss 2013/14 Switchgear cabinet Analysis on the basis of a damage by dust
221 Steel mill Brasilien Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
222 Steel mill Bremen Germany 2013/14 Analysis on side Analysis on the basis of a damage by fire
223 Power station Wächtersbach Germany 2013/14 Switchgear cabinet Analysis on the basis of a damage by fire
224 Copper mine Sambia Zambia 2013/14 Analysis on side Analysis on the basis of a damage by dust
225 Pharma manufacturer Düsseldorf Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
226 Offshore Power station Rostock Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
227 Power plant Karlsruhe Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
228 Hard coal mine Lebach Germany 2013/14 Switchgear Analysis on the basis of a damage by fire
229 Rolling mill Duisburg Germany 2013/14 Frequency Connverter Analysis on the basis of a damage by dust
230 Onshore Power station Büttel Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
231 Paper mill Papier Belgium 2013/14 PCB`s Analysis on the basis of a damage by dust
232 Paper mill Grimma Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
233 Rolling mill Bremen Germany 2013/14 Frequency Connverter Analysis on the basis of a damage by dust
234 Cupper mine Chile Chile 2013/14 Analysis on side Analysis on the basis of a damage by dust
235 Ship yard Audorf Germany 2013/14 Analysis on side Analysis on the basis of a damage by dust
236 Manufacturer China China 2013/14 Analysis on side Analysis on the basis of a damage by dust
237 Technology provider Waltershausen Germany 2013/14 Frequency Connverter Analysis on the basis of a damage by dust
238 Disposak company Germany 2014/15 Frequency Connverter Analysis on the basis of a damage by dust
239 Paper mill Kasachstan 2014/15 Frequency Connverter Analysis on the basis of a damage by dust
240 Powerstation Netherlands 2014/15 Control Systems Analysis on the basis of a damage by dust
241 Rolling mill Germany 2014/15 Engines Analysis on the basis of a damage by dust
242 Rolling mill North Germany 2014/15 Frequency Connverter Analysis on the basis of a damage by dust
243 Powerstation Germany 2014/15 Renovation after damage by fire Analysis on the basis of a damage by fire
244 Automotiv producer Germany 2014/15 Renovation after damage by fire Analysis on the basis of a damage by fire
245 Salt mine Germany 2014/15 Frequency Connverter Analysis on the basis of a damage by dust
246 Shipping company Germany 2014/15 Frequency Connverter Analysis on the basis of a damage by dust
247 Powerstation Germany 2014/15 Analysis on side Analysis on the basis of a damage by dust
248 Winds park North Sea Germany 2014/15 Analysis after damage by fire Analysis on the basis of a damage by fire
249 Power Station Dubai 2014/15 Instrumentation and control systems Analysis on the basis of a damage by dust
250 Sugar factory Germany 2015/16 Analysis after damage by fire Analysis on the basis of a damage by fire
251 Cement plant cement plant 2015/16 Frequency Connverter Analysis on the basis of a damage by dust
252 Power Station Italy 2015/16 Control sytems Analysis on the basis of a damage by dust
253 Power Station Hamm Germany 2015/16 Frequency Connverter Analysis on the basis of a damage by dust
254 Automotiv producer Germany 2015/16 Renovation after damage by fire Analysis on the basis of a damage by fire
255 Cement plant Tunesien 2015/16 Frequency Connverter Analysis on the basis of a damage by dust
256 Shipping company Germany 2015/16 Frequency Connverter Analysis on the basis of a damage by dust
257 Crane manufacturer China 2015/16 Frequency Connverter Analysis on the basis of a damage by dust
258 TV Provider Mainz Germany 2015/16 Damage by Fire Analysis on the basis of a damage by fire
259 Power Station Egypt 2016/17 Frequency Connverter Analysis on the basis of a damage by dust
260 People Mover Rusia 2016/17 Frequency Connverter Analysis on the basis of a damage by dust
261 Refinery Poland 2016/17 Control cabinets Analysis on the basis of a damage by dust
262 Pump Manufacturer Germany 2016/17 20 KV Switch Gear Analysis on the basis of a damage by dust
263 Oil field Germany 2017/18 Frequency Connverter Analysis on the basis of a damage by dust